WKT 0.00% 10.5¢ walkabout resources ltd

Transport from Lindi, page-3

  1. 15,986 Posts.
    lightbulb Created with Sketch. 6857
    @SpareCash7

    I thought it would be best to respond to your post here so it doesn't get lost.


    You made the assumption that two trucks were being loaded in one day, I find that hard to believe based on the information I disclosed above.

    You also assumed that one truck was being loaded from inside the warehouse, I cannot see this as being possible when there is very little room for a truck to be loaded when you consider the limited space inside the shed.

    As you can see in the tweet below, there will be limited room for a truck to park inside the shed and successfully be loaded by a fork lift.

    https://hotcopper.com.au/data/attachments/6278/6278680-b9b497fb62cded8a2664a9b19a0b514c.jpg

    The one solution for loading would be to install a gantry crane inside the shed, this would allow for the graphite to be stockpiled on both sides of the shed as Mike indicated, this would allow for the truck to park inside of the shed to be loaded without using the fork lift.

    The other alternative would be to install a covered roof outside of this shed to allow for the whole shed to become a small onsite storage rather than using third party storage.

    Anyway, this appears to be a bit of a bottle neck, it would be nice to see a tweet of a truck being loaded in the shed to see if this was a poor assessment or if this is why we are seeing the trucks being loaded next to the warehouse.


 
watchlist Created with Sketch. Add WKT (ASX) to my watchlist
(20min delay)
Last
10.5¢
Change
0.000(0.00%)
Mkt cap ! $70.48M
Open High Low Value Volume
11.0¢ 11.0¢ 10.5¢ $6.241K 57.75K

Buyers (Bids)

No. Vol. Price($)
7 287933 10.5¢
 

Sellers (Offers)

Price($) Vol. No.
11.0¢ 1104375 17
View Market Depth
Last trade - 16.10pm 19/07/2024 (20 minute delay) ?
WKT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.