PVE 0.00% 4.0¢ po valley energy limited

Ann: PVE - Podere Maiar-1 Slick Line Operations Results, page-2

  1. 1,432 Posts.
    lightbulb Created with Sketch. 859
    80,000 scm x 37 euro cents x 63% share = $11M AUD per year in cashflow which would be over $10M FCF.

    80,000 is the gross production rate of the PM1 asset. If that lasts during the gross lifespan of 13.4 BCF it will last 13 years.

    PVE is effectively trading on a 4.5x NPAT with none of the other project upside or asset realisation factored in. No wonder the directors are loading up!
 
watchlist Created with Sketch. Add PVE (ASX) to my watchlist
(20min delay)
Last
4.0¢
Change
0.000(0.00%)
Mkt cap ! $46.35M
Open High Low Value Volume
3.9¢ 4.1¢ 3.9¢ $55.46K 1.390M

Buyers (Bids)

No. Vol. Price($)
1 25348 3.9¢
 

Sellers (Offers)

Price($) Vol. No.
4.0¢ 248952 2
View Market Depth
Last trade - 16.10pm 19/07/2024 (20 minute delay) ?
PVE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.