MAY 6.90% 3.1¢ melbana energy limited

Ann: Block 9 Alameda 3 Appraisal Update (Alameda reservoir), page-504

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 8,018 Posts.
    lightbulb Created with Sketch. 1557
    My Q
    To safeguard against poor outcome in a drilling and reservoir appraisal campaign, what independent third party quality and procedural oversight controls and supervision are might be employed for a deep onshore oil well into stacked carbonate reservoirs. How many staff are required to ensure all measures taken by the drilling team can be safeguarded from mistake and also corrective action’s taken in a timely manner following the recognition of not following standard procedures or, actual mistakes made in not conforming with standard procedures when followed

    chat GPT response
    To safeguard against poor outcomes in a drilling and reservoir appraisal campaign for a deep onshore oil well into stacked carbonate reservoirs, robust independent third-party quality and procedural oversight controls are essential. Here are the key measures that can be employed:

    1. **Independent Audits and Inspections**: Regular audits and inspections conducted by independent third-party firms specializing in drilling and reservoir appraisal. These audits should cover all aspects of the drilling operation, including planning, execution, data acquisition, and reporting.

    2. **Technical Reviews and Assurance**: Engaging independent technical experts or consultants with expertise in carbonate reservoirs, drilling operations, and reservoir appraisal. These experts can provide unbiased assessments of procedures, data quality, and interpretation throughout the campaign.

    3. **Quality Assurance Protocols**: Implementing rigorous quality assurance protocols that include thorough documentation, verification processes, and adherence to industry standards and best practices.

    4. **Real-Time Monitoring and Data Analysis**: Utilizing advanced monitoring technologies and real-time data analysis to monitor drilling parameters, reservoir conditions, and performance metrics. This allows for early detection of deviations from expected outcomes or technical issues.

    5. **Contractual Requirements**: Ensuring contracts with drilling contractors and service providers include clear requirements for adherence to approved procedures, reporting standards, and accountability measures for deviations or mistakes.

    6. **Training and Competency Assurance**: Ensuring all personnel involved in the campaign are adequately trained, competent, and aware of procedures and safety protocols. This includes regular training updates and competency assessments.

    Regarding staffing requirements to ensure effective oversight and timely corrective actions:

    - **Quality Assurance and Compliance Team**: This team typically consists of inspectors, auditors, and quality assurance specialists who conduct independent audits and inspections. The size of this team depends on the scale and complexity of the project but could range from a few individuals for smaller operations to a larger team for more extensive campaigns.

    - **Technical Experts**: Depending on the specific challenges posed by carbonate reservoirs and the complexity of the appraisal campaign, multiple technical experts may be required. These could include reservoir engineers, geologists, petrophysicists, and drilling engineers with expertise in carbonate formations.

    - **Data Analysts and Interpretation Specialists**: Professionals skilled in data analysis and interpretation of reservoir data acquired during the campaign. Their role is critical in identifying trends, anomalies, and potential issues that may require corrective actions.

    - **Emergency Response and Contingency Planning Team**: Dedicated personnel trained and prepared to respond to emergencies or incidents that could impact the success of the campaign. This team ensures that corrective actions can be implemented swiftly and effectively.


    Overall, the staffing requirements will vary depending on factors such as the size of the drilling campaign, the complexity of the reservoirs, regulatory requirements, and the company's internal policies. The key is to have a well-rounded team with diverse expertise and clear protocols for oversight and corrective actions to mitigate risks and ensure a successful outcome in drilling and reservoir appraisal campaigns.


    I wonder what Melbana did (of the italics) to hold the contractor accountable (bold)?

    Looking forward to outcome of this campaign Audit.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
3.1¢
Change
0.002(6.90%)
Mkt cap ! $104.4M
Open High Low Value Volume
3.0¢ 3.1¢ 3.0¢ $23.16K 752.0K

Buyers (Bids)

No. Vol. Price($)
3 511097 3.0¢
 

Sellers (Offers)

Price($) Vol. No.
3.1¢ 330507 5
View Market Depth
Last trade - 16.10pm 01/11/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.