KEY 0.00% 0.1¢ key petroleum limited

ep 437 - north perth basin , page-63

  1. 1,263 Posts.
    lightbulb Created with Sketch. 3

    "I think they way they constructed this timing is at least unethical and abusive"

    amer222333,

    If I am reading your post correctly, you are actually talking about corruption at the board level? Are you also implying that they have delayed the arrival of the rig by 1 week to ensure that results of EP437 will not be known until after the offer closes?

    Cheers
    R
 
watchlist Created with Sketch. Add KEY (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.