MAY 4.35% 2.4¢ melbana energy limited

Ann: Webinar - Block 9 Field Development Plan, page-32

  1. 6,510 Posts.
    lightbulb Created with Sketch. 2462
    Question 1)
    "What is the plan for the Sherritt 1 Rig over the next 6months?"

    Question 2)
    "Has work commenced on construction of the other well pads in Block 9?"

    Question 3)
    "How far behind is Sonangol with their contributions to Melbana?"

    Question 4)
    "Does the joint venture agreement stipulate that Sonangol pays 70% for any delays/overruns?"

    Question 5)
    "Is a capital raise now inevitable after Marti and Alameda failed to flow?"

    Question 6)
    "Do you think the quality of the oil [heavy oil] contributed to the inability to flow?"

    Question 7)
    "What is the real reason behind getting second opinions about the Alameda logs, and only perforating one section of Alameda as opposed to the original plan?"

    Question 8)
    "If fracking is needed, how and when will this happen. If an electronic submersible pump is required at depth, how and when will this be implemented?"

    Question 9)
    "Why couldn't the separator from the Amistad unit 3 flow test be used on the Marti/Alameda flow tests, did something go wrong with it?"

    Question 10)
    "What is Sonangol's thoughts on continuing with the Joint Venture after Alameda/ Marti's performance?"

    Question 11)
    "Was Marti/Alameda just a flash in the pan instead of a long steady producer?"


    I can probably think of more questions later...
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.4¢
Change
0.001(4.35%)
Mkt cap ! $80.88M
Open High Low Value Volume
2.3¢ 2.5¢ 2.3¢ $95.57K 3.980M

Buyers (Bids)

No. Vol. Price($)
3 616339 2.4¢
 

Sellers (Offers)

Price($) Vol. No.
2.5¢ 2011501 13
View Market Depth
Last trade - 16.10pm 27/08/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.