Main Pit Pushback PEA summary: 60k oz/yr production at $ US 863 AISC, for $ US 59 million capex. The after-tax 5% discounted NPV:
At $1900/oz US gold: $ A 236 million, 64% IRR
At $2000/oz US gold; $ A 265 million, 72% IRR
Note costs are up since the PEA was published (Dec 2020), but obviously so is gold. Also, some of the overburden was removed in Summer 2021, lowering the capex.
https://ceo.ca/@newswire/superior-gold-announces-positive-preliminary-economic
Liked the 1.2 million tons at 2.4 g/t, out of Plutonic underground in today's announcement.
MPP is just low-hanging fruit, when CYL gets around to it.
- Forums
- ASX - By Stock
- CYL
- Ann: Catalyst achieves full year production of 110koz
Ann: Catalyst achieves full year production of 110koz, page-9
-
-
- There are more pages in this discussion • 43 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CYL (ASX) to my watchlist
(20min delay)
|
|||||
Last
$3.07 |
Change
0.000(0.00%) |
Mkt cap ! $693.7M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 1320 | $3.14 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$2.92 | 4411 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 10000 | 3.050 |
1 | 250 | 3.040 |
1 | 1700 | 3.000 |
1 | 2083 | 2.990 |
1 | 1000 | 2.960 |
Price($) | Vol. | No. |
---|---|---|
3.080 | 320 | 1 |
3.100 | 458 | 1 |
3.180 | 314 | 1 |
3.250 | 3000 | 1 |
3.300 | 9997 | 2 |
Last trade - 09.40am 11/11/2024 (20 minute delay) ? |
Featured News
CYL (ASX) Chart |
Day chart unavailable
The Watchlist
3DA
AMAERO INTERNATIONAL LTD
Hank Holland, Executive Chairman and CEO
Hank Holland
Executive Chairman and CEO
SPONSORED BY The Market Online