Money of Mine YouTube channel just covered the Bgl quarterly from about the 24min mark if anyone wants to have a look and listen (sorry not sure if link will work)
https://youtu.be/ymC5lMftjSM?si=wusfTEfi6g5qb7Vi
No real comment on the gap between expected cash flow and what was realised but still interesting. A major point made was that the total mine is quite spread out so they need extra capital for more ventilation etc and also there seems to be a bottle neck getting ore out for processing partly because it's hard rock to get through. Also the high grade of Deacon could be limiting the recovery (90% reported is down on expected 95%) because the plant is optimised for lower grades closer to the 6g/t reserve average. Certainly it's felt the DFS cost numbers are too low and costs will be higher. Anyway better to go have a listen rather than me try and translate.
- Forums
- ASX - By Stock
- BGL
- Ann: Quarterly Activities Report
Ann: Quarterly Activities Report, page-46
-
-
- There are more pages in this discussion • 21 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BGL (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.37 |
Change
-0.035(2.49%) |
Mkt cap ! $1.752B |
Open | High | Low | Value | Volume |
$1.42 | $1.43 | $1.37 | $9.449M | 6.791M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 62949 | $1.37 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.38 | 62250 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
6 | 62949 | 1.370 |
6 | 215133 | 1.365 |
10 | 140648 | 1.360 |
1 | 33671 | 1.355 |
16 | 150293 | 1.350 |
Price($) | Vol. | No. |
---|---|---|
1.380 | 62250 | 3 |
1.385 | 38989 | 2 |
1.390 | 44070 | 3 |
1.395 | 84816 | 2 |
1.400 | 72560 | 3 |
Last trade - 16.10pm 14/08/2024 (20 minute delay) ? |
Featured News
BGL (ASX) Chart |