CSIRO was Wrong, page-120

  1. 2,644 Posts.
    lightbulb Created with Sketch. 88
    How long ago was that?

    I was sitting in at system control for a project in early seventies when Viv price was about 4.5cents and max demand was about 6500MW in vic.

    There is current pricing on line at our casino site,

    https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/data-nem/data-dashboard-nem

    https://www.nem-watch.info/widgets/reneweconomy/
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.