re: announcement? Tasarman, the announcement on 25 Nov stated that the surface step-out hole was 200 m west of A050. Two other rigs were working underground, with a tird to be added. Looking at the map it appears that A049, A051, and A052 are all holes started from the decline. Results from the surface rig were expected late December.