TAM 6.90% 2.7¢ tanami gold nl

Ann: Quarterly Activities Review & Appendix 5B, page-5

  1. 3,961 Posts.
    lightbulb Created with Sketch. 333
    When are critical path management procedures going to be used? There was talk of planning and costing of the restart of the processing plant,which ran from 2000 to 2006 and is under C&M. Where is the report of activity if any? This should be going on at the same time as proving up resources which are already in the 2m oz area. It is increasingly looking like sleepy hollow. Have rodents been eating the wiring? Are wheels being lubricated and turned over? Has anything been stolen? There is a gas pipeline from the N-S Amadeus pipeline nearby now (Tanami branch pipeline) This would be much cheaper fuel than diesel to generate electricity to run it.
 
watchlist Created with Sketch. Add TAM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.