18 months. If everything was ready to go. Another 18 months to build the mine. There's still enough float in time to get it done both water and copper production by 2028-29. It would be head down bum up and go for it. With little time for excuses. If thete was a time to shine? This is it.
- Forums
- ASX - By Stock
- HCH
- Ann: Quarterly Activities/Appendix 5B Cash Flow Report
Ann: Quarterly Activities/Appendix 5B Cash Flow Report, page-172
-
-
- There are more pages in this discussion • 88 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HCH (ASX) to my watchlist
(20min delay)
|
|||||
Last
85.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $128.7M |
Open | High | Low | Value | Volume |
85.0¢ | 85.0¢ | 84.0¢ | $38.97K | 45.98K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 60 | 83.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
85.0¢ | 3232 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 60 | 0.835 |
2 | 3802 | 0.830 |
2 | 30000 | 0.825 |
3 | 3620 | 0.820 |
3 | 8900 | 0.800 |
Price($) | Vol. | No. |
---|---|---|
0.850 | 3239 | 1 |
0.860 | 4357 | 2 |
0.870 | 3962 | 1 |
0.875 | 10000 | 1 |
0.880 | 44458 | 2 |
Last trade - 13.13pm 14/10/2024 (20 minute delay) ? |
Featured News
HCH (ASX) Chart |