"A1 will use less than 10 percent of these water rights.", such a green and great project with minimal water use is now delayed so long by the water permit issue, which should have not happened at all. Just feel the bureaucracy in US really needs change. But I think the water permit issue should be concluded anytime from now, maybe an ann will be dropped this week or next
- Forums
- Lounge
- The Froggy Channel.
The Froggy Channel., page-8551
-
- There are more pages in this discussion • 266 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
JBY
JAMES BAY MINERALS LIMITED
Andrew Dornan, Executive Director
Andrew Dornan
Executive Director
SPONSORED BY The Market Online