SGQ 3.03% 3.2¢ st george mining limited

Ann: ACQUISITION OF HIGH-GRADE ARAXA NIOBIUM PROJECT, page-140

  1. 2gg
    122 Posts.
    lightbulb Created with Sketch. 16
    11821-S-BA-RL-02-GE_r1 document (google trannslated):

    "The Work Plan presented in this document considered the existing information made available by ITAFOS and public archives. In summary, the plan indicates the need for: Requesting documentation from third parties, especially CBMM; Hiring a company specialized in geotechnics to evaluate the documentation obtained, field inspection, preparation of technical specifications for field and laboratory tests, geological-geotechnical evaluation, hydrological-hydraulic evaluation and preparation of the Final Technical Opinion; Hiring a topographic survey; Hiring drilling, field and laboratory tests; and, Review of the Mining Plan. As described in this document and presented in item 5, the total period is estimated to be up to 2 (two) years for the development of the next stages of work with a focus on obtaining and generating the information necessary for the completion of the characterization of the Araxá Project area – Rare Earths and assessment of the impacts of the implementation of the mining pit on the structure of Dam B4, owned by CBM."
 
watchlist Created with Sketch. Add SGQ (ASX) to my watchlist
(20min delay)
Last
3.2¢
Change
-0.001(3.03%)
Mkt cap ! $31.63M
Open High Low Value Volume
3.5¢ 3.7¢ 3.2¢ $640.8K 18.51M

Buyers (Bids)

No. Vol. Price($)
20 4689383 3.2¢
 

Sellers (Offers)

Price($) Vol. No.
3.3¢ 132167 4
View Market Depth
Last trade - 16.10pm 13/08/2024 (20 minute delay) ?
SGQ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.