The Froggy Channel., page-8756

  1. 13,218 Posts.
    lightbulb Created with Sketch. 274
    KOCH have thrown in $250k for their pilot plant trials at green river brother.
    ASN have all infrastructure in place thete and have drilled to 11kft for the EXTRACTION well. Its a critical step toward production that MAN are $$ and years away from.
    Your hype about EF BG etc is just that.
    Why so good gor MAN if do bad for ASN?
    You are really being bi polat in your arguments here. If the lithium story is dead then it is of no benefit to you MAN or electroflow.... make up your mind.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.