KCN 3.02% $1.29 kingsgate consolidated limited.

General discussion, page-5263

  1. 190 Posts.
    lightbulb Created with Sketch. 86
    So to answer your question- the A pit main was stripped of a lot of high grade gold just before the closedown. As a result the current pit shape is not ideal, with lots of waste to remove, and less high grade to access easily. So they are having to redesign the pit- the new geologist is taking charge of this. Quartz lease is a hill, and they can’t safely start mining there until the western wall of A pit is flattened.
    As a consequence grade is way down, but will pick up slowly.
    The new equipment is badly needed, and is a very astute decision. They can put more through the mill to try and offset the grade problems with reliable equipment.
    I empathise with everybody about the comms, but to be fair the team at KCN are happy to talk to you- you just need to be respectful and not behave like a man-child.
    We just gotta be patient. It’s hard but, even I am getting a bit bipolar with all the issues.
 
watchlist Created with Sketch. Add KCN (ASX) to my watchlist
(20min delay)
Last
$1.29
Change
-0.040(3.02%)
Mkt cap ! $331.2M
Open High Low Value Volume
$1.32 $1.32 $1.27 $1.071M 834.5K

Buyers (Bids)

No. Vol. Price($)
2 10500 $1.28
 

Sellers (Offers)

Price($) Vol. No.
$1.29 22864 2
View Market Depth
Last trade - 16.10pm 23/08/2024 (20 minute delay) ?
KCN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.