ASN 0.00% 7.5¢ anson resources limited

Ann: Underground Injection Control Permit Granted at Green River, page-66

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 538 Posts.
    lightbulb Created with Sketch. 75
    Do your own research but i think where we are up to is basically FEED which would then setup the next steps for construction/building permits. So I think we're basically close to the end for GR just need to finish up with Koch. Man I hope its great results cause if they can step up and provide the units - we can see how quickly that scales!

    For Paradox, I think based on my basic look - we really need the pipeline build/use and long term brine sign off. There seemed to be existing pipelines there for oil fields? and so I reckon there is a good chance these will get over the line. It sounds like though, we need these legislative changes to enable that sign off to re-use the existing pipeline footprints and capped oil wells for brine extraction.

    I reckon GR will get up first.

    Interestingly, in the older announcements they bucketed GR into the Paradox headings. Treating the two as one project. There was some debate on this but I reckon the LG offtake will be serviced by GR if it gets there first.

    This has been a learning. I jumped into this share in the early days but missed some of this detail. Would love others views and whether I am wrong here.
 
watchlist Created with Sketch. Add ASN (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.