Imagine this crazy hyperthetical at the Equador project (Brazil), assuming:
*Strike length 5,000 metres x width of 1,000 metre x 100 metre depth.
*That would equate to 500 million cubic metres of host material.
*If 0.1 % Tantalum, then that would be approx. 500,000 cubic metres of Tantalum.
*Therefore, 500,000 x $6-8 million AUD per cubic metre = Approx $3-4 Trillion AUD.
I would be happy with that!
All the best!
MicroNova2035
IMHO / DYOR
- Forums
- ASX - By Stock
- SUM
- SUM Chart
SUM Chart, page-1517
-
-
- There are more pages in this discussion • 435 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SUM (ASX) to my watchlist
(20min delay)
|
|||||
Last
16.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $14.24M |
Open | High | Low | Value | Volume |
16.5¢ | 16.5¢ | 16.0¢ | $21.13K | 129.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 30344 | 16.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
17.0¢ | 7803 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 30344 | 0.165 |
3 | 291612 | 0.160 |
2 | 20500 | 0.155 |
6 | 130165 | 0.150 |
3 | 41327 | 0.145 |
Price($) | Vol. | No. |
---|---|---|
0.170 | 7803 | 1 |
0.180 | 29811 | 3 |
0.185 | 10000 | 1 |
0.190 | 55000 | 1 |
0.195 | 150762 | 2 |
Last trade - 12.08pm 06/11/2024 (20 minute delay) ? |
Featured News
SUM (ASX) Chart |