BRU 3.85% 7.5¢ buru energy limited

Ann: LOI Executed for Canning Basin Drilling Campaign, page-320

  1. 65 Posts.
    lightbulb Created with Sketch. 43
    Right. The plot thickens... Shallow is mentioned in both. Slight wording changes in sub-sections (2.1 shown below).

    (EARS ID) 124366 - Well Drilling Environment PlanSummary DocumentHSE-SUM-074 | Revision 2 | 3/07/2024:

    https://hotcopper.com.au/data/attachments/6451/6451693-ab388816890af9200dd742993f5c8b41.jpg
    128305 - Well Drilling Environment PlanSummary DocumentHSE-SUM-074 | Revision 3 | 9/08/2024:

    https://hotcopper.com.au/data/attachments/6451/6451735-37856fb3443d7715789036248618f12d.jpg
 
watchlist Created with Sketch. Add BRU (ASX) to my watchlist
(20min delay)
Last
7.5¢
Change
-0.003(3.85%)
Mkt cap ! $50.35M
Open High Low Value Volume
7.8¢ 7.8¢ 7.5¢ $34.04K 441.4K

Buyers (Bids)

No. Vol. Price($)
3 115816 7.5¢
 

Sellers (Offers)

Price($) Vol. No.
7.8¢ 62079 1
View Market Depth
Last trade - 14.28pm 11/09/2024 (20 minute delay) ?
BRU (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.