BCM brazilian critical minerals limited

Ann: MoU signed with Permanent Magnet Producer, page-17

  1. 7,661 Posts.
    lightbulb Created with Sketch. 2073

    “This will be best and probably only REE project with legs.”

    …..and could be the first Brazilian IREE operation into production outside of Serra Verde because an in situ leach operation is much cheaper, easier and faster to build and permit than the complex plants that Meteoric and VMM need to build, if they ever get built.

    No mining fleet or mining contractors required, or any huge leach tanks or clay washing plant either. Just some trenches, pipework, collection tanks and the final refinement (if necessary) and precipitation of the magnetic REE product.

    https://hotcopper.com.au/data/attachments/6454/6454606-41b5f805eda83f3fecc70eaae4adeb8b.jpg


 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
1.1¢
Change
0.000(0.00%)
Mkt cap ! $14.41M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
2 566000 1.0¢
 

Sellers (Offers)

Price($) Vol. No.
1.2¢ 826780 6
View Market Depth
Last trade - 12.12pm 30/06/2025 (20 minute delay) ?
BCM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.