Moly mines average grade is .05% for their project.
These guys have hit 156m at .11% including 30m at .35% and a 2 metre section hit 1.00%
Im in and happy to hold as people slowly realise the significance of these result.
In the ann. the chairman says that drilling is continuing and more excellent results are expected,
Add to My Watchlist
What is My Watchlist?