They have drilled a pilot hole and now that will be drilled out to 36 inch diameter and then run 30 inch surface casing. It takes time.
When that is complete then they will install BOP's and drill some more
- Forums
- ASX - By Stock
- MMR
- noticed received..
noticed received.., page-5
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MMR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $3.236M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
MMR (ASX) Chart |
Day chart unavailable