I am no way an expert on the issue of the cost of developing a mine but here is my two cent worth which more knowledgeable posters can correct for my errors. CMM have updated their Gibson mine development cost. The total cost is $260m plus $83m pre-production mining working capital or a total of $343m.
The $260m cost includes the following which SPR already has to my knowledge but some may require enhancements ie additional costs ( given CMM is developing an OP mien not sure all the the items below are needed):::
- Mine access roads;
▪ Earthworks for process plant, access road and access tracks;
▪ Mechanical infrastructure for the process plant including potable water supply, sewerage
treatment, RO plant, process plant buildings and workshop, light vehicle fuel storage facility
and site communication system;
▪ Administration offices, workshops and stores;
▪ Mechanical infrastructure for the mine including fuel storage facility, heavy vehicle
workshop and stores, heavy vehicle wash bay;
▪ Water supply pipeline and associated borefield;
▪ Unsealed airstrip to facilitate its use by mid size (70pax) aircraft;
▪ Village construction for approximately 400 rooms;
▪ Power generation and fuel storage facilities; and
▪ Light vehicles and various mobile plant.
Is anything else missing?
In addition there is the processing plant (CMM plant is 5mtpa) which SPR will need to enhance and they need a tailings dam and no idea what SPR plan for that (maybe the old open pit ha ha but probably not!). They will have the drill drive completed and paid.
I assume they will use a mining contractor which I assume will mean they do not need to outlay capital for underground mining and related equipment.
So the biggest costs seem to be pre-production working capital (maybe the CMM figure is okay as an estimate) and upgrading the plant plus the tailings dam (unless they have one to use for a period of time before needing a new one) but there will be a number of other smaller costs. $300m seems very high and $200m seems more sensible but still may be a bit high.
Any other views?
-
- Forums
- ASX - By Stock
- SPR
- Ann: Dalgaranga Gold Project - Mineral Resource Estimate Update
SPR
spartan resources limited
Add to My Watchlist
1.89%
!
$2.16

Ann: Dalgaranga Gold Project - Mineral Resource Estimate Update, page-265
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
$2.16 |
Change
0.040(1.89%) |
Mkt cap ! $2.768B |
Open | High | Low | Value | Volume |
$2.13 | $2.16 | $2.12 | $10.47M | 4.878M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 14927 | $2.16 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$2.17 | 88518 | 9 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 14927 | 2.160 |
5 | 76244 | 2.140 |
1 | 16902 | 2.130 |
4 | 58741 | 2.120 |
5 | 47540 | 2.110 |
Price($) | Vol. | No. |
---|---|---|
2.170 | 88518 | 9 |
2.180 | 53598 | 3 |
2.190 | 60344 | 3 |
2.230 | 12001 | 1 |
2.250 | 20535 | 2 |
Last trade - 16.10pm 17/06/2025 (20 minute delay) ? |
Featured News
SPR (ASX) Chart |
The Watchlist
RC1
REDCASTLE RESOURCES LIMITED
Ronald Miller, Non-Executive Director
Ronald Miller
Non-Executive Director
SPONSORED BY The Market Online