Some of the conditions are mostly relevant to the stage 2 water supply. Below are the actual recommendations to the minister from the EPA.
Note that the sad faces are just formatting from my copy/paste - not any type of emotion.
Recommendation to the Minister:
The Committee recommends that the appeal be allowed to the extent that the following changes to conditions be made.Current recommended condition B5-3The proponent must take reasonable steps to consult with the Yugunga-Nya People about the achievement of the outcomes in condition B3-1 and B5-1(2) and objective in condition B5-2 for the life of the proposal.Proposed condition B5-3The proponent must take reasonable steps to consult with the Yugunga-Nya People about the achievement of the outcomes in condition B1-1, B2-1, B3-1 and B5-1(2) and objective in condition B5-2 for the life of the proposal.Current recommended condition B2-3The proponent shall not commence extraction of ore within the Scenario 2 Disturbance Footprint unless the CEO confirms in writing that: (1)the proponent has undertaken a troglofauna habitat connectivity assessment in accordance with subterranean fauna technical guidance and submitted it to the CEO;Proposed condition B2-3The proponent shall not commence extraction of ore within the Scenario 2 Disturbance Footprint unless the CEO confirms in writing that: (1) the proponent has undertaken a troglofauna habitat connectivity assessment in accordance with subterranean fauna technical guidance and submitted it to the CEO and the Yugunga-Nya Native Title Aboriginal Corporation;Current recommended condition B7-1At least twelve (12) months prior to the commencement of construction activities in the Stage 2 Water Supply Area, the proponent must prepare and submit a Staged Disturbance Footprint Report to the CEO that ... Appeals Committee Report to the Minister for Environment – December 2024 3Appeal objecting to the EPA’s Report and Recommendations – Report 1755 **anintha Vanadium Project Proposed Condition B7-1At least twelve (12) months prior to the commencement of construction activities in the Stage 2 Water Supply Area, the proponent must prepare and submit a Staged Disturbance Footprint Report to the CEO and the Yugunga-Nya Native Title Aboriginal Corporation that ...Current recommended condition C1-1 The proponent must not undertake1) groundwater abstraction until the CEO has confirmed in writing that the environmental management plan required by condition B2-4 meets the requirements of conditions B2-4, C4 and C5, and incorporates the research program required by condition B6;Proposed condition C1-1The proponent must not undertake: (1) groundwater abstraction until the CEO has confirmed in writing that the environmental management plan required by condition B2-4 meets the requirements of conditions B2-4, C4 and C5, and incorporates the research program required by condition B6 and has considered the recommendations outlined in Appendix D4- B of the Environmental Review Document.
- Forums
- ASX - By Stock
- AVL
- EPA
AVL
australian vanadium limited
Add to My Watchlist
11.1%
!
0.8¢

EPA, page-34
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
0.8¢ |
Change
-0.001(11.1%) |
Mkt cap ! $69.07M |
Open | High | Low | Value | Volume |
0.9¢ | 0.9¢ | 0.8¢ | $145.0K | 18.00M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 1354453 | 0.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.9¢ | 11191281 | 27 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 1354453 | 0.008 |
28 | 10957708 | 0.007 |
14 | 14868333 | 0.006 |
11 | 8033336 | 0.005 |
8 | 20780000 | 0.004 |
Price($) | Vol. | No. |
---|---|---|
0.009 | 11105615 | 25 |
0.010 | 19136191 | 37 |
0.011 | 5457537 | 20 |
0.012 | 6541796 | 18 |
0.013 | 3710838 | 17 |
Last trade - 16.21pm 27/06/2025 (20 minute delay) ? |
Featured News
AVL (ASX) Chart |
The Watchlist
PAR
PARADIGM BIOPHARMACEUTICALS LIMITED..
Paul Rennie, MD & Founder
Paul Rennie
MD & Founder
SPONSORED BY The Market Online