Phoenix Water - PXW - Lithium - 100x, page-2372

  1. 534 Posts.
    lightbulb Created with Sketch. 9
    As of June 2023

    Phoenix held 15000 + Acres (which is now even more)
    BHE held 17000 acres (According to the latest court briefing BHE projects need 13,000 acre-feet from available land for non-agricultural projects)
    CTR held 3000 Acres (According to the latest court briefing they require 6,500 acre-feet which mean CTR bought more lands since June 2023).
    Energy Source held 2000 Acres.

    At this stage there are four players, and we are unknown player.
    So, I think the mentioned of 5380 Acre in court briefing is related to Phoenix.

    Remember, we are working on East Brawly site which may be portion of our total land holding.


    Reference from latest court hearing:

    If we follow the petitioner’s math, in their brief they note that there’s 25,000 acre-feet set aside for non-agricultural projects,” said Suzanne Varco, representing CTR. “They say that 5,380 of those acre-feet have already been allocated to a private project. We don’t dispute that, that project’s already got their water allocation. So that leaves 19,620 acre-feet. “They claim that the BHE projects need 13,000 acre-feet, which would leave 6,620. This project only requires 6,500. So even under their analysis, there is enough water for all the projects,” Varco added.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.