So your timeframe is nothing more than unfounded speculation, probably not relevant then since the company believes it can be done in a much shorter timframe.
Not sure why you are quoting numbers for rail construction when the rail line runs through the tenement at BM. You are right that there is a rail line that runs neraby to Loy Yang, but you will need to build some line to get there and travel through the heart of Melbourne to get to the other side of the State around a 250km journey. That is probably why the State was looking at building a line from LV to Port of Hastings.
I noticed a few comments about "great team, terrible product", from my research the Exergen process is comparable if not better on every single measure.
- Forums
- ASX - By Stock
- ECT
- mnm v esi
mnm v esi, page-57
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ECT (ASX) to my watchlist
|
|||||
Last
0.4¢ |
Change
0.001(16.7%) |
Mkt cap ! $11.10M |
Open | High | Low | Value | Volume |
0.4¢ | 0.4¢ | 0.3¢ | $538 | 150.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
45 | 18034912 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 12731463 | 25 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
45 | 18034912 | 0.003 |
19 | 13292678 | 0.002 |
10 | 17300024 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 12731463 | 25 |
0.005 | 5451603 | 27 |
0.006 | 5239567 | 10 |
0.007 | 1118334 | 6 |
0.008 | 332213 | 4 |
Last trade - 15.59pm 04/07/2024 (20 minute delay) ? |
Featured News
ECT (ASX) Chart |