Ann: Drilling Confirms Potential for World-Class Titanium Project, page-137

  1. 7,011 Posts.
    lightbulb Created with Sketch. 657
    Hello everyone. For me, today's announcement did not meet my expectations however PTR still remains promising to me. I have my doubts PTR will reach its exploration target, in terms of commercial tonnage. While i am only a back of the envelope amateur (hacker), i guess the entire deposit may possibly have 200 million useable mineable tonnes (but naturally I could be completely wrong). 200 million tonnes would be a 20 year mine life at 10Mt pa ROM.

    https://hotcopper.com.au/data/attachments/6789/6789319-b930a888a182dfa13ff82901609bb063.jpg
    The line of holes to the east was both narrow in length (1200 metes) and of low grade so i discarded this line of holes:

    https://hotcopper.com.au/data/attachments/6789/6789406-ec71eb4c261423ad4dd92f3476ec99c2.jpg

    The 100% PTR ground that looks commercial is the area I have highlighted in green, which i guess may possibly have 100 million tonnes, per the calculations underneath.

    https://hotcopper.com.au/data/attachments/6789/6789431-16ecc2d1eeaa4727f98f068905f5302c.jpg
    I am speculatively guessing this area may have 100 million tonnes at say 10% HM with 7% titanium.

    https://hotcopper.com.au/data/attachments/6789/6789497-a633ac4ce9c997335c440dbdcf2e6f3f.jpg


    As for the PTR/NYM 70/30 JV, the deposit looks just as thick but with lower grade. We do not know anything at this time about its mineral assemblage, including its iron content, therefore i attributed a 65% titanium content, which is lower than the 70% titanium content i attributed to the 100% PTR deposit. Notably, the NYM deposit looks open to the west for another 800 metres, therefore might probably have additional tonnage. I guess NYM may have to now or soon contribute pro-rata expenditure to further development, given ADN's sole spending obligation is only $500,000. NYM told me they put aside money for this; at least in the short term.

    Currently I guess this NYM/PTR deposit has 83 million tonnes @ 5.5% titanium. However if it continues a further 800 metres to the west the tonnage might possibly be 105 million tonnes.

    In summary, I wildly guess the two deposits may have around 200 million tonnes at 6+% titanium content. I guess at this time NYM may eventually hold 11% to 13% of the titanium content. However, we await details on the mineral assemblage of the NYR JV ground; particularly the iron content.

    All the best folks with your decisions. smile.png

    PTR & NYM obviously need to drill so much more to accurately quantify an Indicated JORC.

    https://hotcopper.com.au/data/attachments/6789/6789782-00bade5cdd2bf73b0f2179cbfaedb579.jpg


    https://hotcopper.com.au/data/attachments/6789/6789773-c1bfd85b2c1a1780c03079ac1e9cc89e.jpg





 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
29.0¢
Change
-0.010(3.33%)
Mkt cap ! $100.2M
Open High Low Value Volume
29.0¢ 29.5¢ 29.0¢ $41.59K 142.9K

Buyers (Bids)

No. Vol. Price($)
1 15544 29.0¢
 

Sellers (Offers)

Price($) Vol. No.
30.0¢ 190499 3
View Market Depth
Last trade - 15.59pm 16/06/2025 (20 minute delay) ?
PTR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.