daytrades jan 27 pre-market, page-14

  1. 4,658 Posts.
    lightbulb Created with Sketch. 35
    mii

    Feasibility Study for Lennard Shelf on track for Q2 2011 release as further
    High-Grade Lead/Zinc mineralisation Intersected from extensional drilling at
    Cadjebut Splay Prospect
    Highlights
    ?h Extensional drilling at the Cadjebut Splay prospect within Meridian??s Lennard Shelf
    Project in Western Australia has continued to intersect high grade lead and zinc
    mineralisation, up to 22.26% combined lead and zinc,
    ?h Drilling has occurred outside the current boundary of the Cadjebut Splay Inferred
    Mineral Resource (1.1Mt @ 2.4% Zn, 8.4% Pb and 15.7g/t Ag, above a combined 3%
    zinc plus lead cutoff);
    ?h Best results from the final five (5) holes of the drill program include:
    o 9m @ 22.3% Pb+Zn in CS10-088
    o 3.9m @ 11.7% Pb+Zn in CS10-089
    o 2m @ 8.6% Pb+Zn in CS10-087
  2. This thread is closed.

    You may not reply to this discussion at this time.

 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.