So cc 10 Mt of ore to be mined at a strip ratio of 4.4
that is 55 MT of ore and waste
and yet they show the cyclone pit alone is :
"The Cyclone deposit area extends over an east-west length of 1.45 km (464,295 – 465,745 mE) and north-south length of 625 m (8,173,995 – 8,174,620 mN) and spans a vertical distance of 125 m (157.5 – 282.5 mRL)
lets say the average length is 800 meters and the average width is 475 meters from half way down the pit in depth
and the pit is 125 deep
800M * 475 M * 125 M is 47.5 M cubic meters * guessing SG 2.9 so 137M tonnes
137-10= = 127 tonnes of waste = 12.7:1 strip ratio if all the ore was just in Cyclone and does not include the waste in the other pits - just my quick calculations and may be far out
But Really find it hard to see how the strip ratio they state is only 4.4 total .
Would be nice to see a rebuttle to prove me wrong , can anyone provide it ?
- Forums
- ASX - By Stock
- AW1
- Ann: Storm Copper Project Preliminary Economic Study
AW1
american west metals limited
Add to My Watchlist
5.13%
!
3.7¢

Ann: Storm Copper Project Preliminary Economic Study, page-43
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
3.7¢ |
Change
-0.002(5.13%) |
Mkt cap ! $30.86M |
Open | High | Low | Value | Volume |
4.0¢ | 4.0¢ | 3.7¢ | $62.24K | 1.633M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 559786 | 3.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.8¢ | 130000 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 559786 | 0.036 |
12 | 1303500 | 0.035 |
6 | 1348235 | 0.034 |
5 | 363742 | 0.033 |
4 | 488750 | 0.032 |
Price($) | Vol. | No. |
---|---|---|
0.038 | 130000 | 2 |
0.039 | 300000 | 1 |
0.040 | 276777 | 3 |
0.042 | 426309 | 1 |
0.043 | 275321 | 2 |
Last trade - 10.39am 07/08/2025 (20 minute delay) ? |
Featured News
AW1 (ASX) Chart |