AW1 american west metals limited

Ann: Storm Copper Project Preliminary Economic Study, page-43

  1. 35,728 Posts.
    lightbulb Created with Sketch. 2335
    So cc 10 Mt of ore to be mined at a strip ratio of 4.4
    that is 55 MT of ore and waste

    and yet they show the cyclone pit alone is :
    "The Cyclone deposit area extends over an east-west length of 1.45 km (464,295 – 465,745 mE) and north-south length of 625 m (8,173,995 – 8,174,620 mN) and spans a vertical distance of 125 m (157.5 – 282.5 mRL)

    lets say the average length is 800 meters and the average width is 475 meters from half way down the pit in depth
    and the pit is 125 deep
    800M * 475 M * 125 M is 47.5 M cubic meters * guessing SG 2.9 so 137M tonnes

    137-10= = 127 tonnes of waste = 12.7:1 strip ratio if all the ore was just in Cyclone and does not include the waste in the other pits - just my quick calculations and may be far out

    But Really find it hard to see how the strip ratio they state is only 4.4 total .
    Would be nice to see a rebuttle to prove me wrong , can anyone provide it ?
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
3.7¢
Change
-0.002(5.13%)
Mkt cap ! $30.86M
Open High Low Value Volume
4.0¢ 4.0¢ 3.7¢ $62.24K 1.633M

Buyers (Bids)

No. Vol. Price($)
5 559786 3.6¢
 

Sellers (Offers)

Price($) Vol. No.
3.8¢ 130000 2
View Market Depth
Last trade - 10.39am 07/08/2025 (20 minute delay) ?
AW1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.