ESG 0.00% 86.5¢ eastern star gas limited

citi group downgrades esg to sell, page-19

  1. 3,890 Posts.
    Some numbers (for those interested) from AOE 2007 Mooranbah Gas Project:

    82 producing wels - 82
    Maximum single well producing flow rate - 2.1mmcfd
    Field production rate - 45mmcfd

    http://www.arrowenergy.com.au/icms_docs/29925_Fourth_Quarter_Activities_Report.pdf

    The project is supplying 20.5PJ to Townsville pipeline and 1.25PJ p.a to AGL for 12MW powerstation. Not too disimilar to, say, ESG's ERM MOU and Wilga Park project.

    By my numbers AOE was producing 0.54mmcfd per well. That's not unachievable for ESG IMO depending on whether the results for Bibblwindi West can be replicated generally across the field.

    JT
 
watchlist Created with Sketch. Add ESG (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.