The proof of this will be in the PFS.
As they knock over the important elements of conc transport for the magnetite, environ clearances, met recovery and grades to each of the products then all will be understood,
The current information on these things is still scant.
The volume of Magnetite is v small compared to its not very close neighbor at Savage R.
The company has at times not known if it was Arthur or Martha.
First it was a Tungsten play, now its a Tin play, next 6 months it could be a Tungsten play again.
The use of equivalents is risky because as the prices change relative to each other the pit optimizations can change, which effect any reserve calcs. This effects costs and leaks into strip ratios etc.
Lets see the PFS.
Still on a watching brief. I will take my chance on the dip.
- Forums
- ASX - By Stock
- VMS
- sophisticated holders sold their shares
sophisticated holders sold their shares, page-45
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add VMS (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.1¢ |
Change
-0.001(8.33%) |
Mkt cap ! $29.37M |
Open | High | Low | Value | Volume |
1.2¢ | 1.2¢ | 1.1¢ | $20.61K | 1.718M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
15 | 4705999 | 1.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.2¢ | 958135 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
15 | 4705999 | 0.011 |
16 | 4156595 | 0.010 |
6 | 5793333 | 0.009 |
4 | 2262500 | 0.008 |
4 | 2928571 | 0.007 |
Price($) | Vol. | No. |
---|---|---|
0.012 | 958135 | 2 |
0.013 | 752734 | 3 |
0.014 | 700000 | 3 |
0.015 | 4332292 | 4 |
0.016 | 1374330 | 5 |
Last trade - 16.10pm 09/09/2024 (20 minute delay) ? |
Featured News
VMS (ASX) Chart |