    Look that is a reasonable guess so I'm not 100% sure p90 knows anything more than we do. Knowing that this will definately be a production well the rig will be doing the full work down hole to ensure no sand inflows by gravel packing and doing perferations at several levels. This is not a quick workover and turn on the tap job in my mind.

    Not taking anything away from p90 but every rig can get set for a flow in between 5 and 14 days dependant on depth , packing and down hole delays and what work was done on the hole before . Actual time flow testing and pressure testing etc can be determined / limited by storage capacity on board, capacity of rig (no problems there) and the amount of data the rig/owners wants at different chokes.

    Guessing the obvious timings from industry experience is not the same as knowing exactly what is going on so perhaps if p90 was to provide exact format of down hole preparations or something that could later be verified we could know that info is for real.
 
watchlist Created with Sketch. Add HDR (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.