ESR estrella resources limited

"You ain't seen nothing yet, page-78

  1. 474 Posts.
    lightbulb Created with Sketch. 658
    Keith — great post!

    Now let’s walk through a conservative valuation scenario for ESR, focusing solely on the limestone component!

    LIMESTONE VALUATION assumptions:
    Resource size: 500 million tonnes of JORC-compliant limestone

    Sale price: USD $15 per tonne (approx. AUD $22.50 at 0.667 FX rate)

    Net margin: 15%, accounting for middlemen and operational costsFX used: 1 USD = 1.50 AUD

    Gross revenue:500,000,000 tonnes × AUD $22.50 = AUD $11.25 billion

    Net profit @ 15% margin:AUD $11.25 billion × 0.15 = AUD $1.6875 billion

    Now here’s the cautious part:Let’s assume significant dilution, with the total shares on issue eventually increasing to 4 billion, double the current register.EPS = AUD $1.6875 billion ÷ 4 billion shares = AUD $0.42 per share

    Valuation range using extremely conservative P/E multiples:
    P/E 2x = AUD $0.84
    P/E 3x = AUD $1.26
    P/E 4x = AUD $1.68

    Even after assuming maximum dilution and rock-bottom P/E multiples, you’re still looking at a SP that no longer resembles and Junior explorer.

    UPSIDE IF ESR CRUSHES LOCALLYIf ESR crushes and screens the limestone on-site in Timor-Leste (e.g. 10–30mm flux-grade), sale prices could increase to USD $25–30 per tonne (AUD $37.50–$45.00).

    Let’s use USD $25/t as a midpoint:Revenue = AUD $18.75 billion

    Net profit @ 20% = AUD $3.75 billion

    EPS = AUD $3.75 billion ÷ 4 billion shares = AUD $0.94

    Even on a P/E of 3x = AUD $2.82 per share

    Now to the big question...
    How does ESR define 500Mt of limestone under JORC in the next 3.5 months — with just a 13,000m drill program?

    Per the announcement, ESR must:
    • Announce a JORC Code compliant resource ≥500Mt by 30 September 2025
    • Complete a positive Scoping Study by 30 November 2025
    • Secure export approvals and port infrastructure by 31 December 2025

    These aren’t aspirations — they’re contractual deadlines, and the JORC resource is critical for triggering REM’s minimum offtake obligations.

    It’s likely to be Inferred, but still, it will unlock asset-level financing, infrastructure partnerships, and external funding options.

    If they can show there’s 4x that limestone in the ground, which I believe,

    ESR could become one of the largest undeveloped industrial mineral stories on the ASX.

    Also watch today's close, we must be getting close to the drill landing in Timor-Leste, and I’d like to see some strength ahead of that, hopefully beginning next week.

    One catalyst at a time, but 30 September is shaping up to be a defining moment for ESR.
    Last edited by Timorlad: Friday, 13:19
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
4.4¢
Change
0.000(0.00%)
Mkt cap ! $90.28M
Open High Low Value Volume
4.5¢ 4.6¢ 4.3¢ $126.6K 2.855M

Buyers (Bids)

No. Vol. Price($)
2 89144 4.4¢
 

Sellers (Offers)

Price($) Vol. No.
4.6¢ 652163 3
View Market Depth
Last trade - 15.54pm 13/06/2025 (20 minute delay) ?
ESR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.