Reading it from the bottom is better.
"If everything goes wrong, we should have to raise a million dollars" - Funding tracker since that comment = ~$2.5m
June 1 2025 Gold Coast Investment Showcase 30 June 2025 "[profitable production]...we're just hitting that point now. As of today, or next week we are that close to making quite serious money. You could say we are at break even now. Some days we are at break even, some days we are under it. But we're at the inflection point." 2 miningcomau 27 June 2025 "Our challenge right now is getting ore feed above 15TPD, we're around about that level now. Over the next few months we'll go form 15 to 30" 3 miningcomau 27 June 2025 " the ramping up will take a matter of months and we'll be generating very strong cashflow". 4 miningcomau 27 June 2025 "In the last couple of months, we've sold 3-400,000 worth of gold. We have to expand the number of underground headings to accelerate the supply of ore. Will happen over the next week and months" 5 miningcomau 27 June 2025 "We've expanded it from 30TPD to 50TPD and now we're concentrating on ramping up ore extraction from the mine" 6 miningcomau 6 June 2025 "We have a plant capacity of 50TPD. Our mine can deliver 15 to 20 TPD" 7 May 8 FECL 24 May 2025 "The capacity will be at the 50 tpd level any day now with the installation of an additional four agitator tanks, taking the total to 10." 9 **promotion blocked** 22 May 2025 "@ 1.2m per round, moving to 1.8m, 2.4m and then 3m rounds" 10 **promotion blocked** 22 May 2025 "probably doing about 15TPD of material, next few weeks will expand to 30 and to 50 in a few months" 11 ASX 21 May 2025 "Aguia is pleased to say that it has received gold sales proceeds of approximately A$193,000 from gold produced from the Santa Barbara Project." 12 ASX 21 May 2025 "Having achieved this certification it will now be a streamlined process for future sales, on a continuous basis. There will be another sale of a similar amount within the next week as the gold has already been produced." 13 ASX 21 May 2025 "mining of mineralised veins and processing that mineralisation through the 30 tpd plant that now is having four additional agitation tanks installed over the next week to attain the rated capacity of 50 tpd. It will take a number of weeks of further development for the underground operations to build up to a corresponding tonnage" 14 ASX 20 May 2025 "Aguia is pleased to report that the underground workings are now consistently delivering 15 tonnes per day (tpd) to the processing plant. The previously reported 20 gpt gold from the trial mining operation conducted by Boyateca appears to be a reliable guide as to the average grade that Aguia is able to recover." 15 ASX 20 May 2025 "The processing plant is capable of treating material at the rate of 30 tpd. It is the intention of the Company to be able to deliver a matching tonnage of high-grade vein material in the second half of May" 16 ASX 20 May 2025 "We are now at the inflection point beyond which we expect to be earning significant cash”. 17 Auzbiz 15 May 2025 "If everything goes wrong we should have to raise a million dollars" 18 Auzbiz 15 May 2025 "As each week goes past this level, we'll be increasing the cashflow from the gold mining, by the time June/July comes along we should be swimming in cash" 19 Auzbiz 15 May 2025 "The key risk from here is timing, if I give you a figure for two months' time from here, I have to make sure I achieve that or be conservative and underestimate that" 20 Auzbiz 15 May 2025 "Treating ore at around 15TPD by June, July at the latest, problem is getting ore into the plant" 21 Auzbiz 15 May 2025 "We know what we're paying out and what we are receiving, we've got a fat profit margin" 22 Auzbiz 15 May 2025 "We're cashflow positive" 23 Auzbiz 15 May 2025 "We turned the plant on in December and it's working smoothly, almost perfectly 4-5 months later." 24 April 25 ASX 30 Apr 2025 "Mining rates increased steadily during the quarter with development rates increasing month on month from January (11.4 metres) to March (57.6 metres) a fivefold increase in metres developed. Subsequent to the end of the quarter metres developed in April increased to 112.9 m on the introduction of two 12-hour shifts per day roster, 5 days per week." 26 ASX 30 Apr 2025 "Mineralised Tonnes extracted in the quarter: 195.2 tonnes" 27 Ignite Investment Summit, Hong Kong, March 2025 2 Apr 2025 "I'd like to think our next announcement will be in the middle of April where we can report on two weeks of continuous production, real numbers, we're allowed to report that, and I think people will be quite impressed when they see what we have done". 28 Ignite Investment Summit, Hong Kong, March 2025 2 Apr 2025 " we're on the way to 50TPD by the end of june". 29 Ignite Investment Summit, Hong Kong, March 2025 2 Apr 2025 "to go from 0 to cashflow positive stage it's been less than $3m dollars" 30 March 31 Proactive Investors 13 Mar 2025 "By the middle of May we should be producing significant gold in terms of profitability" 32 ASX 7 Mar 2025 "The Santa Barbara processing facility is continuing to ramp up towards the 50 tpd rate at a satisfactory pace" 33 February 34 Auzbiz 14 February 2025 " [Picture of plant]... that's operating at 30TPD now, but it did take a little bit of maintenance and repairs previously when it was operating it was doing so on a batch basis, we've got it on a continual basis". 35 January 36 ASX 31 Jan 2025 "Our efforts are now focused on scaling up the plant to a 50 TPD operation which will occur in the current quarter along with our maiden exploration and development drill program."
- Forums
- ASX - By Stock
- AGR
- Summary of commentary
AGR
aguia resources limited
Add to My Watchlist
7.14%
!
3.0¢

Summary of commentary
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
3.0¢ |
Change
0.002(7.14%) |
Mkt cap ! $44.37M |
Open | High | Low | Value | Volume |
2.8¢ | 3.1¢ | 2.8¢ | $180.7K | 6.037M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 1576084 | 2.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.1¢ | 200000 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 1327666 | 0.029 |
5 | 1676606 | 0.028 |
2 | 819248 | 0.027 |
4 | 1010000 | 0.026 |
3 | 2070000 | 0.025 |
Price($) | Vol. | No. |
---|---|---|
0.031 | 200000 | 2 |
0.033 | 109059 | 1 |
0.034 | 250000 | 1 |
0.038 | 50000 | 1 |
0.039 | 54000 | 1 |
Last trade - 15.56pm 25/07/2025 (20 minute delay) ? |
Featured News
AGR (ASX) Chart |
The Watchlist
P.HOTC
HotCopper
Frazer Bourchier, Director, President and CEO
Frazer Bourchier
Director, President and CEO
SPONSORED BY The Market Online