Hi there sharks37,
couldn't agree more,at 07-00 on the 28th only the 1st plug had been drilled with 960 BOPD.Since then ell stated a 790 BOPD on the 30th (from his contact).
I and others have posted numerous terrible weather articles about power still being down,oilers being shut down all over the state etc etc.
If we get an update this week stating the drilling of the plugs is complete I will be truly amazed.I would think that when these rigs are shutdown by a power cut there may well be some sort of maintenance,procedures etc to wind her up to production again.
There is nothing anyone can do about the weather and if people want to sell to move to something else well so be it.
By the way I have my own man on the ground in N Dakota and he has just sent me some footage of the Earl well getting her power back. This footage just shows how much commitment TB has for his company and I think all of us shareholders should send him a big thankyou for his great work.
TERRY GETTING POWER BACK
- Forums
- ASX - By Stock
- SSN
- need a progress ann
need a progress ann, page-16
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SSN (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online