EFS #3 now to commence drilling in Mid-june.
Which means EFS #4 should commence drilling at the end of July.
This means that EFS #3 can be fracced at the scheduled time, but EFS#4 (assuming it was to be fracced immediately after 3) might be delayed a week or two. I could be wrong though.