re: Ann: Significant Coal Intercept at Nuurst... the XAM infrastructure restraints are the same as AKM albeit XAM far better positioned
when the railway is built, it will be twice the distance to AKM than to XAM
AKM are considering trucking some coal 550km in 2012
again, XAM are far better position, with half the trucking distance
XAM is better positioned than AKM
Add to My Watchlist
What is My Watchlist?