VAN 0.00% 4.7¢ vango mining limited

present position......., page-76

  1. 2,313 Posts.
    http://www.asx.com.au/asxpdf/20110616/pdf/41z7sbhwff66kc.pdf

    I have tried to find a comparison for vaulation. Right or Wrong Ill put it up for comment.

    ABZ:
    71cps (26 week high = 89cps or another +25%)
    100mil shares on issue (55 mil on escrow until Dec 2011)
    10mil options
    MC: $70mil+
    Cash: $7mil
    Resource JORC: 60mt Bauxite
    Targetting: 200 to 300mt
    Refinery: At 150mt
    Status: Emerging - Valued Inground Bauxite

    ORD:
    9.5cps
    470mil shares
    MC: $45mil
    Cash: 3mil $ + 3mil$ to come from JV CO + 10mil Debt Equity
    Targetting: 300mt+
    Resource: 130mt
    Refinery: At 200mt
    Status: Advanced Emerging - Valued Inground Bauxite

    Assuming we get our 300mt target in next update, this will be 5 x the resource of ABZ.

    71 cps x 5 = $3.55

    $3.55 / 4.7 (our shares on issue) = 75.5

    75.5 x 30% (our interest in asset?) = 22.5cps

    Assumptions:
    1.Given our production and shipping costs would be estimated a lot lower than due to Laos to China, Vs Aust to China.
    2.Given the advanced nature of our ability to secure funding for a refinery with 30% of $600 mil refinery, with 30% funding by SARCO IPO, and 70% through Project Debt Financing. ($88,200,000k = $26,460,000 at 30% = $0.055cps)
    3. As completion nears, I would expect increase to value of SARCO Shares to appreciate.
    3. Given our relatively short time frame to complete a refinery once all signed off.
    4. Given Value of by productions
    5. Alumina Valued higher than Bauxite after Refinery built.
    6. Ongoing Resource upgrades whilst refinery being built.

    Assumption Value = 10cps

    Time discount 10%

    My Guesstimate = 29.25cps
    So up more than 300% from where we are now.


    NOT INCLUDED:
    1. Suple Jack and WW (Gold)- Waiting on results
    2. Copper Flats (Copper)
    3. 5 to 10% of Caledon (upon GRAM Aquisition of CCD, 26 August 2011)
    4. Value of future JV Co new aquisitions as they get them (including note 2- Copper Flats)



    If 500mt target attained (total reasonable resource potential 1.5bt to 2.5bt)

    71 cps x 8.33 = $5.91

    $5.91 / 4.7 (our shares on issue) = $1.25cps

    $1.25 x 30% (our interest in asset) = 37.7cps

    Assumption Value = 10cps

    Time discount 10%

    My Guesstimate = 42.75cps


 
watchlist Created with Sketch. Add VAN (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.