Would it be possible if someone could do NPV Calcs based on 50mtpa iron ore $21 cash cost and a conservative $100 per tonne iron ore price then $120 per tonne iron ore price?
Since this is a take over the NPV wouldnt need to reduce our EPS since we dont have to sell off 50% stake for the Equity.