Ok, thanks Novac, I've gone back and refreshed my memory. They do state that they're going to try to make more money off B18b first (cashflow now is always better than cashflow later :D ).
They do have a gas plant feasibility study due now though. I hope they have been able to provide all the information the engineering consultant requires in a timely manner.
That's a lot of things now that are supposed to be due on the mental list. I should probably get in contact and ask.
- Forums
- ASX - By Stock
- HOG
- 60 minutes
60 minutes, page-25
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HOG (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online