SYN 0.00% 0.1¢ synergia energy ltd

fraccing complete, page-9

  1. 27 Posts.
    Based on experience from companies operating in the Eagleford shale in Texas, I would think clean up should take a week, 2 at the most.

    They haven't said how much fluid was injected for the frac job, but I think next update should tell us how much the have recovered and the should have a good idea how long the remainder should take.

    I'm optimistic that it will only take a week and that we might even get initial flow rates next week

    I don't know, but the quicker it cleans up, I presume the better the well (higher pressure).
 
watchlist Created with Sketch. Add SYN (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.