have a look at page 3 in the quarterly. note the 1180 sill drive and areas near it that are planned to be mined, then have a look at figure 5 that shows the 1180 sill drive aswell. thus getting an idea of just how high the grade of ore is they are starting to mine. from figure 5 some 40g/t ore will be hopefully hitting the mill this quarter.
Add to My Watchlist
What is My Watchlist?