I've recently being attempting to talk up the stock to some mates, but one mate who is a surveyor commented which I guess many of us have overlooked is it seems along way (Coolgardie to the other side of Kalgoorlie) to transport open pit ore grade to nimbus plant, I have been told the road trucks can transport no more than 60 tonne loads at a time?
Would the Mgt consider relocating the plant?
- Forums
- ASX - By Stock
- MRP
- value
value, page-2
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)