LNR lanthanein resources ltd

andewa project drilling demonstrates excellent, page-4

  1. 769 Posts.
    Well there's mineralisation down much of the length of the first two holes (awaiting results on ADH003) including importantly to the end of hole at ~400m (vertical depth from surface some 200-250m). Holes 1 and 2 are ~3km apart. The anomalies extend to at least 6-800m in depth. Even if the mineralisation is lowish grade it's looking increasingly likely we may really be sitting on a truely massive system. Very exciting times.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.