    KMC: Production throughput is exceptional for their market cap, but be careful with 'mining on a calculator'. We don't know how large the resource is, and also you are assuming that the ~4g/t grade is sustained throughout the mines operation.

    At a really, really rough guess for a recovered reserve...

    Each stope is about 7m high, 7m wide and 150m long as per industry standards and page 1 of the August 25 announcement.. Each stope would contain around 20kt of ore assuming a groundmass density of 2.7g/t.

    It looks like there are about 12 stopes being planned as per page 3 of the same announcement.

    So you are looking at a total ore tonnage of about 240kt. If they mine 700t a day, then the mine will only last about one year.

    Just be careful with those PEs guys.
 