ESG 0.00% 86.5¢ eastern star gas limited

annual report, page-9

  1. 1,215 Posts.
    Guys, wait - Look at Page 12 more closely:

    ELECTRIC SUBMERSIBLE PUMPS INSTALLED
    IN SHIELD WELLS AT BIBBLEWINDI MULTILATERAL PILOT
    Electric submersible pumps (ESPs) were installed in
    the build section of the shield wells at each side of
    the Bibblewindi multi-lateral pilot. The build section
    of the well is the curved section ahead of the lateral
    well drilled through the target coal seam to intersect
    the vertical production well. This initiative took early
    advantage of advancements in ESP design that have
    improved potential for use of ESP technology in coal
    seam gas applications.
    By year end, the additional dewatering capability
    associated with installation of the ESPs contributed
    to gas production from the Bibblewindi multi-lateral
    pilot exceeding 1.5 million cubic feet per day. It is
    anticipated the gas production rate will continue to
    climb as water pressure within the Bohena coal seam
    is progressively brought down from present levels of
    around 500 metres of head.
    ● SEISMIC ACQUISITION
    The Company has received approval for an
    88 kilometre seismic survey within the Narrabri
    Gas Project area, the purpose of which is to:
    ● provide infill data linking vintage seismic lines
    to the north and south of the Rosevale area so
    that drilling opportunities can be firmed up; and
    ● investigate Permian sedimentary development
    in the northwestern region of PEL 238.
    The seismic survey will take place in conjunction
    with surveys approved for other acreage operated
    by the Company. Although requisite Government
    approvals have been secured for the surveys, a final
    commitment by the Company to undertake work has
    been delayed while cooperative arrangements are
    agreed with Local Government and communities.
    ● DEWHURST PRODUCTION PILOT
    The Dewhurst lateral production pilot incorporates
    three parallel lateral wells, each intersecting a single
    vertical production well and all targeting the Bohena
    coal seam. Two production wells were operated for
    a short period during the financial year to collect
    data for design of an on-site water storage facility.
    After construction of the water storage facility the
    Dewhurst Pilot will be operated on a temporary basis
    to confirm overall water and gas production profiles.
    Temporary operation will provide data sufficient for
    gas reserves certification purposes.

    This is our reserves upgrade which will be released as part of the independent reserves review in the IER and which Monsters highlighted from the November 2010 announcement...

    Now, there is an outside chance, there will be an additional update from Tintsfield in the IER however this is unlikely in the absence of another bidder imo.

 
watchlist Created with Sketch. Add ESG (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.