I don't feel that the grades are a problem, i remember when i went to uni, you needed 5g/t to have a project, but that was producing 50kozpa, now i've worked on mines treating 0.7 and 0.8g/t, producing 400-600kozpa
Given the probable +2Moz we could see economies of scale and 200kozpa and for that the grade would be awesome.
Add to My Watchlist
What is My Watchlist?