    They've found that they can reduce costs and improve returns by changing some elements of the engineering identified in the FEED and that's bad? If they had of said that the FEED is being totally disregarded and no other engineering alternative is being pursued - that would have been a surefire way of pummelling the share price.

    In fact, I'm quite impressed that they've analysed the FEED and found areas of improvement. The 6 month delay doesn't affect the mine start up date, you know, the date WR kept changing without any explanation.

    Following a review of the FEED report and from information received to date, it has been concluded that further
    changes and improvements can be made to the process plant design to optimise capital and operating costs.
    An engineering firm has been appointed to commence this optimisation study. The process flow sheet has been
    validated, but optimisation of the process plant layout and some of the equipment selection have been identified
    as providing opportunity for significant construction efficiencies and associated capital cost savings.
    In addition, the Company is considering a change to the construction contracting strategy adopted for the FEED
    study, which was to provide a risk adjusted, maximum lump sum capital cost estimate for the project under an
    EPC contract.
    The target completion date for the proposed study is June 2012. Rail and port infrastructure options are
    progressing in parallel with the engineering optimisation study.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.