Just had a look at the presentation again.
Each "Module" is able to process 50k cubic metres per month (about 70kt). All for $1.3M.
If its processing a grade of only 1g/t, that equates to 2572oz of gold for the month. If the Ore Body is big enough, they could deploy multiple modules.
That processing rate is double what SBL was targeting for a fraction of the cost. :S
- Forums
- ASX - By Stock
- SBL
- lion aspirations
lion aspirations, page-9
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SBL (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online