"The forward plan for this well is to install the down hole pump and prepare the well for production operations. We anticipate it will take a few weeks to fully evaluate the results"
No IP results. Seems to me TB is trying to keep a lid on results. He did mention previously that he was evaluating the land for sale from Chk. Perhaps this has something to do with it.
Oh and by the way... THE WELL IS PRODUCTIVE!