Snowy, you are right - it doesn't add up.
BFZ was expected to deliver 28,000t @4.5 g/t
Bobby Dazzler was expected to deliver [? ]t @4.1g/t
BFZ delivered as at 7/11 so far 5,000t @2.1g/t
Bobby Dazzler as at 7/11 so far 3,000t @2.4g/t
So the expected grade was in low to mid 4s and based on very small early samples was in low to mid 2s. What has happened to grade last few weeks - has it been in 4s as expected?
But the total missing ounces is only 2-3 thousand - assuming no improvement in grade as mining continues. Share price smashed by 75% into 9s due to only a few thousand missing ounces (based on early samples only) ?? Another $15m needed ??
Something does not add up.
- Forums
- ASX - By Stock
- CGT
- Ann: Castlemaine Goldfields Limited Broadcast
Ann: Castlemaine Goldfields Limited Broadcast , page-3
-
- There are more pages in this discussion • 16 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CGT (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online